GRUPO ZARAGOZÁ has obtained the status of Ready to Build of a solar park located in Torrejoncillo del Rey (Cuenca).
This is the Villanueva plant, with an installed capacity of 49.99 MWp that will generate more than 250 jobs during its construction, which is expected to begin during Q1 2023 and 3 permanent on-site jobs for the operation and maintenance of the installation. It will have...